PURPOSE

Research often breaks down between a good question and a finished output: roles stay vague, evidence loses provenance, decisions disappear after meetings, and quality checks happen too late. This guide gives trainees a lightweight operating system for preventing those failures.

The operating loop

1. Charter2. Map3. Execute4. Control5. Close
Define the question, output, scope, roles, and approvals.Map evidence, stakeholders, methods, dependencies, and risks.Move bounded work through named owners and reviewable deliverables.Track decisions, versions, exclusions, deviations, and quality checks.Translate work into a reproducible output, contribution record, and next decision.

Designed for trainees contributing to:

SCOPE AND AUTHORITY

This guide supports project operations. It does not determine scientific validity, regulatory status, authorship, statistical methods, clinical care, or data permissions. Follow the principal investigator, institutional policies, IRB or ethics requirements, data-use agreements, protocol, and applicable law.

1. Create a one-page project charter

Do not begin with a task list. Begin with a shared definition of the work. The charter should be brief enough to revisit and specific enough to expose disagreement.

Charter fieldQuestion it must answer
Research questionWhat precise uncertainty are we trying to reduce? What population, setting, exposure or intervention, comparator, and outcome matter when applicable?
Decision or useWho may use the answer, and what could it change?
Primary outputProtocol, dataset, abstraction table, analysis, figure, abstract, presentation, manuscript, or another defined product?
ScopeWhat is included, excluded, deferred, or still unresolved?
Method and standardWhat approved protocol, rubric, codebook, analysis plan, reporting guideline, or institutional procedure governs the work?
People and rolesWho decides, executes, reviews, approves, advises, and must be informed?
MilestonesWhat are the reviewable deliverables, dependencies, and decision dates?
Ethics and dataWhat approvals, consent rules, access controls, confidentiality requirements, and retention rules apply?
Definition of doneWhat evidence will show that the deliverable is complete and ready for the next stage?
THE CHARTER IS NOT THE PROTOCOL

The charter coordinates the team around the approved work. It must not quietly expand eligibility, outcomes, data access, methods, or recruitment beyond the protocol and institutional approvals.

Charter test

2. Build an evidence system, not a reading pile

Every claim should remain connected to its source, study design, context, and limits. The evidence table should make duplication, disagreement, and missing perspectives easier to see.

FieldRecord
Citation and stable identifierFull citation plus DOI, PMID, registry ID, URL, or institutional locator when available.
Question and designWhat the study asked and whether it is experimental, observational, qualitative, evidence synthesis, conceptual, commentary, or other.
Population and settingWho or what was studied, where, when, and under what eligibility criteria.
Exposure, intervention, or phenomenonWhat was measured, delivered, experienced, or compared.
Outcome and findingThe authors' reported result, separated from your interpretation.
Limitations and applicabilityBias, missingness, uncertainty, implementation conditions, and boundaries on generalization.
Project useWhy the source matters: background, method, measure, comparison, gap, contradiction, or discussion.
DispositionInclude, exclude, hold, replace, or seek full text - with a reason and reviewer.

Evidence discipline

EXCLUSIONS ARE DATA

Document why a source, participant, organization, variable, or record was excluded. A silent exclusion cannot be audited, reproduced, or defended later.

3. Translate the protocol into executable work

A protocol describes the approved scientific plan. The operating layer converts that plan into roles, fields, definitions, review rules, and handoffs without changing it.

Operating elementMinimum specificationControl question
Unit of workThe article, record, participant, image, institution, variable, interview, or other item being processed.What exactly moves through the workflow?
EligibilityOperational inclusion and exclusion rules with examples and an escalation path.Would two trained reviewers make the same call?
Data dictionary or codebookField name, definition, allowed values, source, missing-value rule, and notes.Can another person interpret every field?
RubricObservable anchors for each score or classification, including borderline cases.What distinguishes adjacent ratings?
Review modelSingle review, dual independent review, adjudication, or another approved model.Who checks what, and how are disagreements resolved?
HandoffOwner, reviewer, file or system location, due date, acceptance test, and next state.What must be true before the item moves?
Deviation pathHow unexpected cases, protocol questions, and possible errors are paused, logged, and escalated.Who has authority to decide?
PILOT BEFORE SCALING

Run a small, representative sample through the full workflow. Compare interpretations, revise instructions through the approved process, freeze the next version, and only then expand. A pilot is a test of the operating system, not permission to change the study informally.

A reporting guideline helps you describe the work

Select the appropriate guideline early enough to reveal missing documentation. EQUATOR emphasizes that reporting guidelines support transparent reporting; they do not replace study design decisions or quality appraisal.

4. Make ownership and contribution visible

Titles alone rarely explain how work moves. Track responsibility for each deliverable and separately track the contributions people actually make.

RoleOperational responsibility
Decision ownerMakes or escalates the defined decision; confirms scope and acceptance criteria.
Work ownerProduces the deliverable and communicates risks before the due date.
ReviewerChecks against the protocol, rubric, codebook, analytic plan, or other agreed standard.
ApproverAuthorizes the work to move to the next state when formal approval is required.
ContributorProvides a defined input, technical function, relationship, interpretation, or supporting deliverable.
Informed stakeholderNeeds the decision or status but does not own the work.

Deliverable ownership table

DeliverableOwnerReviewerDue / stateAcceptance test

Discuss credit before submission

IMPORTANT DISTINCTION

CRediT makes contributions visible but does not determine who qualifies as an author. Authorship also carries accountability and must follow the applicable policy. Confirm assigned roles with contributors.

5. Run the project from a controlled workboard

A useful workboard shows state, ownership, evidence, and blockers. It should not become a second undocumented protocol or a private list that the team cannot interpret.

FieldWhy it matters
Task or record IDCreates a stable reference across meetings, files, and review comments.
Deliverable and acceptance testDefines the output and what must be true before it is complete.
Owner and reviewerPrevents invisible labor and ambiguous handoffs.
StateUse a small controlled set: Not started, Active, In review, Blocked, Waiting, Complete.
Due date and dependencySeparates real deadlines from preferences and exposes sequence risk.
Source or file locationPoints to the canonical artifact instead of spawning copies.
Blocker and next actionNames what is preventing movement, who can resolve it, and when it will be revisited.
Decision or change referenceLinks the work to the decision log, version, protocol clarification, or approved deviation.

State-transition rules

MoveRequired evidence
Active -> In reviewThe deliverable exists in the canonical location; the acceptance test is self-checked; known limitations are stated.
In review -> CompleteThe named reviewer has checked it; required changes are resolved or documented; approval is recorded when applicable.
Any state -> BlockedThe blocker, effect, decision owner, next action, and review date are visible.
Complete -> ReopenedNew evidence, discovered error, changed scope, or failed acceptance test is logged with a reason.
FREEZE THE SENT RECORD

When outreach, abstraction, coding, or review has been completed, preserve the historical record. Correct through a visible change or new version rather than silently overwriting what happened.

6. Make meetings produce decisions

A research meeting should reduce uncertainty and move work. Circulate enough context for the team to decide, then capture the outcome where the work lives.

Before the meeting

ItemPrepare
DecisionState the choice, decision owner, deadline, and consequence of waiting.
EvidenceLink the relevant protocol section, table, analysis, example, or prior decision.
RecommendationOffer a proposed direction and the strongest credible alternative.
RisksName the scientific, ethical, operational, timeline, and stakeholder risks.
StatusUse Situation, Meaning, Action, Need for concise updates that do not require discussion.

After the meeting

DecisionRationale / evidenceOwnerDueReopen trigger

Decision note

SILENCE IS NOT AGREEMENT

Name the decision and ask for confirmation. When power differences matter, provide a channel for questions or dissent that does not require challenging a senior person publicly.

7. Control quality before the final draft

Quality control should be designed into each handoff. A final review cannot reconstruct missing provenance or reliably detect every silent change.

ControlApply it toEvidence retained
Training and calibrationEligibility, abstraction, scoring, coding, interviewing, or other interpretive workTraining examples, questions, calibration results, and approved clarifications.
Independent reviewHigh-risk classifications, key outcomes, or protocol-defined dual-review workReviewer records, disagreements, and adjudication decisions.
Range and logic checksStructured data and calculated fieldsRules, exceptions, queries, resolutions, and rerun results.
Source verificationClaims, numbers, quotations, tables, and figuresDirect source locator and verifier.
Version controlProtocols, codebooks, datasets, code, figures, and manuscriptsVersion, date, owner, change summary, and approval when needed.
Reproducibility checkAnalysis or transformation workflowsInputs, code or steps, environment or software details, and expected output.
Privacy and access checkData, outreach lists, recordings, transcripts, and shared filesApproved location, permissions, retention rule, and incident path.

Change log

Date / versionWhat changedWhyApproved byAffected work / action
STOP WHEN THE SOURCE AND OUTPUT DISAGREE

Do not patch a table or figure without identifying whether the source data, definition, analysis, transcription, or display is wrong. Correct the causal layer, rerun dependent work, and document the change.

8. Build the output while the work is happening

Do not wait for a blank manuscript to discover that methods, decisions, limitations, and contributor records are missing. Build a living output map from the beginning.

Output elementMaintain during the project
IntroductionProblem, decision relevance, prior evidence, contradiction or gap, and the precise study objective.
MethodsProtocol and approvals, design, setting, eligibility, variables, instruments, procedures, analysis, missingness, quality controls, and deviations.
ResultsPlanned tables and figures, denominator logic, participant or record flow, primary findings, uncertainty, and sensitivity analyses when applicable.
DiscussionWhat the findings establish, what they do not establish, relation to prior evidence, implementation implications, limitations, and next questions.
ContributionsCurrent contribution record, acknowledgements, data or code availability statements, conflicts, funding, and required disclosures.
SubmissionTarget audience and journal, author instructions, reporting checklist, word and figure limits, required files, and approval sequence.

Figure and table brief

DecisionQuestion
PurposeWhat single claim, pattern, comparison, flow, or distribution should the reader understand?
SourceWhich version of the data and analysis produced it?
DefinitionWhat are the denominator, units, categories, missing values, and exclusions?
ReviewWho verifies the numbers, labels, accessibility, privacy, and consistency with the text?
BoundaryWhat should the reader not infer from this display?
REPORTING GUIDANCE IS AN EARLY-WARNING SYSTEM

Use the relevant EQUATOR guideline during protocol and output planning to reveal documentation needs. Confirm the journal's current requirements before submission. A completed checklist does not prove that a study was well designed or executed.

One-page research control sheet

Project / question: ___________________________________________________________________________________

Primary output and use: ______________________________________________________________________________

Scope and governing documentsPeople and decision rights
Protocol / IRB or ethics status / codebook / reporting guideline / data-use rules / inclusions / exclusionsPI or decision owner / work owners / reviewers / approvers / advisors / stakeholders
Current evidence and uncertaintyCurrent deliverables and dependencies
Strongest evidence / contradiction / gap / assumption / unresolved scientific or operational questionOutput / owner / reviewer / state / due date / blocker / acceptance test
Decision neededQuality, ethics, and data checks
Choice / owner / deadline / recommendation / alternative / cost of waiting / reopen triggerApproval / privacy / access / calibration / verification / version / deviation / incident path

Next update

Situation: _______________________________________ Meaning: __________________________________________

Action: __________________________________________ Need and deadline: __________________________________

WEEKLY CONTROL QUESTION

What could make the team believe the project is moving while the scientific, ethical, or operational foundation is quietly weakening?

Standards and scope

Use this operating guide within the approved protocol, your assigned role, and current institutional requirements. It supports reliable trainee contribution but does not replace project-specific research, ethics, data-governance, authorship, or reporting policy.

Authoritative resources to consult

ResourceUse
EQUATOR Network reporting-guideline libraryFind reporting guidance appropriate to the study design. EQUATOR states that reporting guidelines support clear reporting and are not design or quality-appraisal tools.
ICMJE Recommendations: roles of authors and contributorsCheck widely used biomedical-journal guidance on authorship credit and accountability, then follow the target journal and institution.
CRediT Contributor Role TaxonomyDescribe specific contributions through 14 standardized roles. CRediT explicitly does not determine authorship.
NIH Rigor and Reproducibility resourcesReview current NIH policy and resources on rigor, transparency, and reproducibility when relevant.
Local protocol, IRB or ethics office, data-use agreement, and institutional policyThese govern the actual project and take precedence over this guide.

Links verified September 16, 2026

equator-network.org/reporting-guidelines

icmje.org/recommendations - authors and contributors

credit.niso.org

grants.nih.gov - rigor and reproducibility

Before using the system

THE STANDARD

Reliable contribution means the team can understand what you did, trace it to its source, review it against an agreed standard, reproduce the critical steps where appropriate, credit the people involved, and see when or why the work changed.